T O P I C R E V I E W |
marco |
Posted - 02/20/2014 : 09:31:53 How to Process a SSAS MOLAP cube as fast as possible – Part 1
Recently, with some colleagues, I was working on a project with a serious challenge; there was this Analysis Server 2012 system with 40 physical cores, half a Terabyte of RAM and 10TB of SSD storage waiting to get pushed to its limits but it was installed via the famous ‘next,next finish’ setup approach and we had to tune the box from scratch. Also we had to pull the data from a database running on another box which means the data processing will be impacted by the network round-tripping overhead.
Raed more: http://henkvandervalk.com/how-to-process-a-ssas-molap-cube-as-fast-as-possible-part-1 |
|
|